New water main construction. A contractor will begin installing new water main on Wood Rd. on Monday, May 4th. The work will be in the 2100 & 2200 blks. of Wood Rd., Wood Circles East and West, and the 6600 blk. of Franklin Ave. between 9:00 AM and 4 PM. Residents in these areas may experience low or no water pressure, air and some discolored water during this work.Utility personnel will be going door to door to flush services to clear up discoloration and release trapped air through available outside house hose connections. Thank you for your cooperation.