Lakeview Splash Pad 

Announcements

The Splash Pad opens May 29th 2023!

Memorial Day to Labor Day Hours 2023:

9:00AM - 7:00PM daily 

Learn about the pad!

The Lakeview splashpad has been improved! A service line that supplied water to the leaves was repaired which required concrete to be removed and replaced. After a few year hiatus, the water cannons have been repaired and reinstalled. A new feature the “bobble” replaces the turtle which was retired from the splash pad. A number of water use reduction improvements were made including low spray nozzles that reduce water use. All of the elements were deep cleaned and polished along with behind the scenes rebuilding of the manifold. The brushed concrete surface was cleaned to remove lime buildup and had a slip reduction grip coating applied. 

The Middleton Public Lands Splash Pad in Lakeview Park was made possible thanks to generous funding by Madison Community Foundation and American Girl Fund for Children.  

Pictures of the Splash Pad

Splash Pad
leaves
bobble
spray
splash pad pic